Day 1: May 15th, 2002

Note area behind where the pool is being dug....just in front of the fence we are constructing.... nice green grassy area...

Dirt being piled in field adjacent to the area of the dig.

Then the excavator hit ground water at about 6.5 feet....Requiring that gravel be trucked in to backfill the area once it was dug deeper than originally planned, an extra $2450. for cost of labor for excavator, three truckloads of gravel and 1 foot deeper in depth than originally planned..

First truckload of gravel was dumped near the entry that the frontloader was using to access the pool bottom.